Customer:
Stobart Developments
Description:
Phase 1 - Complete Upgrade of Air Traffic Control Facilities at London Southend Airport
Date:
March 2011
Supplied Systems:
ATC System comprising
- Desk Consoles
- Voice Switch
- Voice & Radar Recorder
- VHF Transmitters and Receivers
- UHF Tranceivers
- Emergency Radios
- MasterClock
- Status Monitoring System
- Radar Displays
- Signal Lamp
- Crash Alarm System
- Vector 125 Dual NDB System
- AGL System
- Safety Documentation
- ILS Relocation
London Southend Airport Phase 1
Following the submission of an excellent commercial proposal, coupled with a detailed technical design that fully met specialist requirements, Systems Interface Limited was awarded the contract for this major “turnkey” project by Stobart Developments for the complete upgrade of the Air Traffic Control facilities at London Southend Airport.
Reference
Address:
London Southend Airport
Company:
Limited Southend Airport Southend-on-Sea Essex SS2 6YF
Contact:
Marc Taylor
Phone:
+44 (0)1702 608 129
Fax:
+44 (0)1702 538 501
Email:
Marc.Taylor@stobartair.com
The multi-million pound project commenced with the construction of the long awaited new air traffic control tower in late January.
The tower has been equipped with state of the art systems with specialist avionics installation and commissioning.
Systems Interface was responsible for all aspects of the ATC Systems in the new Control Tower Building, from initial design through to civil works, installation and commissioning and an upgrade of Airfield Ground Lighting and Navigational Aids as well as Safety Documentation.
This multi-million pound development scheme will not only see the upgrade of the complete Air Traffic Control Facilities by Systems Interface, but also the construction of a new £12 million railway station on the airport’s eastern boundary providing regular services into London Liverpool Street Station.
This contract further recognises our experience and reputation built up over the years for strong systems integration skills, delivering on time and within budget.
The new Control Tower went 'live' March 2012
We were also awarded Phase 2 of this project which includes:
- 2 x ILS Systems
- 1 x DME System
- 2 x RVR
- Complete upgrade of existing AGL
For more information regarding the Air Traffic Control Tower systems, Airfield Lighting or any of the other products used in our Southend airport project, then please contact our expert team today using our enquiry form or call +44 (0)1483 267 066.